- Equipment List
- Setting Up the Lab
- Pre-Lab Tasks
- General Guidelines
- Practice Lab 1
- Section 1: Bridging and Switching (15 Points)
- Section 2: IP IGP Protocols (28 Points)
- Section 3: ISDN (8 Points)
- Section 4: EGP Protocols (17 Points)
- Section 5: Voice (6 Points)
- Section 6: DLSw+ (4 Points)
- Section 7: IOS and IP Features (10 Points)
- Section 8: QoS (8 Points)
- Section 9: Multicast (4 Points)
- Practice Lab 1: "Ask the Proctor"
- Section 1.1: Frame Relay Configuration
- Section 1.2: 3550 LAN Switch Configuration
- Section 1.3: ATM Configuration
- Section 2.1: RIP
- Section 2.2: EIGRP
- Section 2.3: Redistribution
- Section 3: ISDN
- Section 4: EGP Protocols
- Section 5: Voice
- Section 6: DLSw+
- Section 7: IOS and IP Features
- Section 8: QoS
- Section 9: Multicast
- Practice Lab 1 Debrief
- Section 1: Bridging and Switching (15 Points)
- Section 2: IP IGP Protocols (28 Points)
- Section 3: ISDN (8 Points)
- Section 4: EGP Protocols (17 Points)
- Section 5: Voice (6 Points)
- Section 6: DLSw+ (4 Points)
- Section 7: IOS and IP Features (10 Points)
- Section 8: QoS (8 Points)
- Section 9: Multicast (4 Points)
General Guidelines
Please read the whole lab before you start.
Do not configure any static/default routes unless otherwise specified.
Use only the DLCIs and ATM PVCs provided in the appropriate figures.
Ensure full IP visibility between routers for ping testing/telnet access to your devices.
Take a 30-minute break midway through the exercise.
Have available a Cisco Documentation CD-ROM or access online the latest documentation from the following URL:
http://www.cisco.com/univercd/home/home.htm
NOTE
Consider accessing only the preceding URL, not the entire Cisco.com website. If you will be allowed to use online documentation during your CCIE lab exam, it will be restricted.