Home > Articles > Networking > Storage

📄 Contents

  1. 1.1 Building a Site from Scratch
  2. 1.2 Growing a Small Site
  3. 1.3 Going Global
  4. 1.4 Replacing Services
  5. 1.5 Moving a Data Center
  6. 1.6 Moving to/Opening a New Building
  7. 1.7 Handling a High Rate of Office Moves
  8. 1.8 Assessing a Site (Due Diligence)
  9. 1.9 Dealing with Mergers and Acquisitions
  10. 1.10 Coping with Frequent Machine Crashes
  11. 1.11 Surviving a Major Outage or Work Stoppage
  12. 1.12 What Tools Should Every SA Team Member Have?
  13. 1.13 Ensuring the Return of Tools
  14. 1.14 Why Document Systems and Procedures?
  15. 1.15 Why Document Policies?
  16. 1.16 Identifying the Fundamental Problems in the Environment
  17. 1.17 Getting More Money for Projects
  18. 1.18 Getting Projects Done
  19. 1.19 Keeping Customers Happy
  20. 1.20 Keeping Management Happy
  21. 1.21 Keeping SAs Happy
  22. 1.22 Keeping Systems from Being Too Slow
  23. 1.23 Coping with a Big Influx of Computers
  24. 1.24 Coping with a Big Influx of New Users
  25. 1.25 Coping with a Big Influx of New SAs
  26. 1.26 Handling a High SA Team Attrition Rate
  27. 1.27 Handling a High User-Base Attrition Rate
  28. 1.28 Being New to a Group
  29. 1.29 Being the New Manager of a Group
  30. 1.30 Looking for a New Job
  31. 1.31 Hiring Many New SAs Quickly
  32. 1.32 Increasing Total System Reliability
  33. 1.33 Decreasing Costs
  34. 1.34 Adding Features
  35. 1.35 Stopping the Hurt When Doing This
  36. 1.36 Building Customer Confidence
  37. 1.37 Building the Teams Self-Confidence
  38. 1.38 Improving the Teams Follow-Through
  39. 1.39 Handling an Unethical or Worrisome Request
  40. 1.40 My Dishwasher Leaves Spots on My Glasses
  41. 1.41 Protecting Your Job
  42. 1.42 Getting More Training
  43. 1.43 Setting Your Priorities
  44. 1.44 Getting All the Work Done
  45. 1.45 Avoiding Stress
  46. 1.46 What Should SAs Expect from Their Managers?
  47. 1.47 What Should SA Managers Expect from Their SAs?
  48. 1.48 What Should SA Managers Provide to Their Boss?
  • Print
  • + Share This
This chapter is from the book

1.5 Moving a Data Center

  • Schedule windows unless everything is fully redundant and you can move first half of a redundant pair and then the other—Chapter 20.
  • Make sure that the new data center is properly designed for both current use and future expansion—Chapter 6.
  • Back up every file system of any machine before it is moved.
  • Perform a fire drill on your data backup system—Section 26.2.1.
  • Develop test cases before you move, and test, test, test everything after the move is complete—Chapter 18.
  • Label every cable before it is disconnected—Section 6.1.7.
  • Establish minimal services—redundant hardware—at a new location with new equipment.
  • Test the new environment—networking, power, uninterruptable power supply (UPS), heating, ventilation, air conditioning (HVAC), and so on—before the move begins—Chapter 6, especially Section 6.1.4.
  • Identify a small group of customers to test business operations with the newly moved minimal services, then test sample scenarios before moving everything else.
  • Run cooling for 48–72 hours, and then replace all filters before occupying the space.
  • Perform a dress rehearsal—Section 18.2.5.